Skip to main content
Operating Rules & Regulations
Operations & Procedures

Operating Rules & Regulations

Operational guidelines and infrastructure for a fully licensed UAE port of entry.

The essentials

Operating rules

24x7 Operations

24x7 Operations

RAK Airport and air traffic control operate 24x7, supporting continuous airport operations.

Landing and Slot Permit

Landing and Slot Permit

Landing and slot permits are required for applicable operations. Operators should arrange the required approval before arrival.

Flight Plans

Flight Plans

All departing traffic must file a flight plan with the AIS / Met-Briefing Office before departure. Operational support is available 24x7.

Runway & approach

Runway & approach

A single runway 34/16 with Aerodrome Reference Code 4E. Runway 34 is equipped with an ILS Category I precision approach; runway 16 is a non-precision approach.

  • Length 3,760 m · Width 45 m
  • Asphalt surface
  • Handles aircraft up to Boeing 747 size
Air traffic & services

Air traffic & services

Air traffic control is managed by Global Aerospace Logistics, with procedural approach services and full ground handling for passenger, cargo and aircraft.

  • Jet A1 & Avtur fuel via bowser
  • Full passenger & cargo handling
  • Aerodrome Reference Code 4E
Safety first

Rescue and Fire Fighting

Category 9

Rescue and fire-fighting cover rated to Category 9, available 24 hours a day, with dedicated water-tanker support.

Firefighters

Trained firefighters operating four appliances.

Paramedic

Qualified paramedics provide first-response medical support during emergencies.